ORDINANCE NO. 100334
Declaring it necessary to change
and re-establish the grades for construction of N. Congress Avenue, between
Missouri Highway No. 9 and NW 73rd Street, including bridge, and cross-streets
therein, all in Kansas City, Platte County, Missouri; and directing the City
Clerk to cause a notice to be published as provided for herein.
WHEREAS, the
Council finds that for the public good it is necessary that the grades on N. Congress Avenue, and intersections at NW 69th
Street, NW 69th Street Terrace, NW 70th Street, and NW 72nd
Street, in Kansas City, Platte County, Missouri, be changed and
re-established; and
WHEREAS,
the Council further finds the Director of Public Works, as evidenced by his
issuing a Declaration of Necessity, No. 5487, adopted and entered on February
18, 2010 has caused the plans and specifications for Project Number 089008091, Street and Storm Water
Improvements to be prepared; NOW, THEREFORE,
BE
IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
Section 1. That
finding it necessary to change and re-establish grades on N. Congress Avenue, from a point beginning just
north of the centerline of Missouri State Highway 9, thence approximately
2772.26 feet north, all being in Kansas City, Platte County, Missouri,
the Council hereby directs that the City Clerk cause a notice of said grade
changes to be published in the newspaper doing the city printing, on each day
of issue of said newspaper for a period of ten (10) days, starting on or about
the date following the passage of this ordinance, and providing a period of
thirty (30) days for remonstrance starting the same day as the first day of the
publication.
Section 2. That grade changes shall be of the nature described and specified
in, and shall be done in accordance with the plans and specifications prepared
and certified by the City Engineer under the supervision of the Director of
Public Works and identified as KCMO Project
Number 089008091, N. Congress Avenue, Street and Storm Improvement
Project, the same being on file in the Office of the Director of Public Works
and being incorporated herein by reference.
Section 3. That
the changing and re-establishing of grades is hereby authorized to commence
when this ordinance becomes effective, and shall be built in accordance with
the plans and specifications as described in Section 2 of this ordinance; locating and defining the grade points of said
streets on the proposed project centerline stationing of each respective
right-of-way, as found on said plans, said grade points being connected by
straight grades (tangents) or vertical curves between such grade points, the
elevations of which are herein given below in feet (NAVD88 directrix), along
with other pertinent alignment data, to-wit:
All
grade points are on the new centerline of N. Congress Avenue as found in said
plans in the office of the Director of Public Works. Said grades for N.
Congress are established in Phases I-IV. Phase II centerline begins at Sta. 20+42.18,
having a coordinate of North 1111255.7743, and East 2741031.4545 thence
northerly along proposed centerline approximately 222.82 feet to Sta. 20+65.07
having a coordinate of North 1111471.7204, and East 2740989.3294. Phase III
centerline begins at Sta. 21+75.00 having a coordinate of North 1111381.5589,
and East 2740990.3383 thence northerly along proposed centerline approximately
1055 feet to Sta. 32+30.00 having a coordinate of North 1112436.6471, and East
2740993.2856. Phase IV centerline begins at Sta. 35+50.00 having a coordinate
of North 1112756.6444, and East 2740994.5976 thence northerly approximately
1280 along proposed centerline to Sta. 48+30, having a coordinate of North 1114036.6210,
and East 2741001.1463. Phase I encompasses bridge construction at Sta. 30+80 to
Sta. 37+00. All grade points for NW 69th Street, NW 69th
Street Terrace, NW 70th Street, and NW 72nd Street are
shown to wit:
Phase I-N. Congress Avenue,
bridge inclusive
Begin const. 30+80.00, El. 927.03
Station Elevation
30+75.00, VPC-El. 944.91
34+00, VPI-El. 912.41
37+00, El. 938.50 (Match exiting
ground)
Phase I-NW 70th
Street
Begin const. 10+00.00=34+00.49,
El. 927.03 (intersection with the centerline of N. Congress Avenue),
Station Elevation
9+86.00, VPI-El. 926.75
9+70.00, VPT-El. 925.60
9+30.00, VPI-El. 922.71
8+90.00, VPC-El. 920.89
Except that the grade planes
meeting at Sta. 9+30.00 shall be connected by a vertical curve of 80 feet in
length.
Phase II-N. Congress Avenue
Begin construction Sta. 20+57.74
(North 1111269.39, East 2741023.79)
Station Elevation
20+57.74, El. 997.26
20+63.00, VPC-El. 997.16
20+92.00, VPI-El. 996.58
21+21.00, VPT-El. 997.57
Except that the grade planes
meeting at Sta. 20+92.00 shall be connected by a vertical
curve of 58 feet in length.
Phase III-N. Congress
Avenue
Begin construction Sta. 21+75.00
(North 1111381.5589, East 2740990.3383)
Station Elevation
21+90.00, VPC-El. 999.91
24+40.00, VPI-El. 1008.41
24+76.77=10+00.00 (intersection
with the centerline of NW 69th Street), El. 998.64
26+90.00, VPT-El. 983.41
Except that the grade planes
meeting at Sta. 24+40.00 shall be connected by a vertical curve of 500 feet in
length.
27+46.78 =10+00 (intersection
with centerline of NW 69th Ter.), El. 977.73
28+00, El. 972.41
29+00, El. 962.41
30+00, El. 952.41
30+75, VPC-El. 944.91
32+30.00, El. 934.12, end const.
Phase III (North 1112436.6471, East 2740993.2856)
34+00=10+00 (intersection with
centerline of NW 70th Street.), VPI-El. 912.41
Phase III-N.W 69th
Street
Begin const. 10+00.00=24+76.77,
El. 998.64 (intersection with the centerline of N. Congress Avenue), North
1111683.4245, East 2740990.1974
Station Elevation
9+86.00, VPI-El. 998.36
9+48.23, El. 997.20 (Match
existing)
Phase III-N.W 69th
Terrace
Begin const. 10+00.00=27+46.79,
El. 977.73 (intersection with the centerline of N. Congress Avenue), North
1111953.4338, East 2740991.3045
Station Elevation
9+86.00, VPI-El. 977.45
9+83.00, VPT-El. 977.39
9+43.00, VPI-El. 976.59
9+03.00, VPC-El. 980.20
Except that the grade planes
meeting at Sta. 9+43.00 shall be connected by a vertical curve of 80 feet in
length.
Phase IV-N. Congress Avenue
Begin construction Sta. 35+50.00
(North 1112756.6444, East 2740994.5976)
Station Elevation
37+25.00, VPT-El. 938.41
Except that the grade planes
meeting at Sta. 34+00.00 shall be connected by a vertical curve of 650 feet in
length.
39+55.08, VPC-El. 956.82
41+00.02, VPI-El. 968.41
42+44.96, VPT-El. 965.12
Except that the grade planes
meeting at Sta. 41+00.02 shall be connected by a vertical curve of 290 feet in
length.
42+45.06, VPC-El. 965.12
43+20.10, VPI-El. 963.42
43+95.14, VPT-El. 967.80
Except that the grade planes
meeting at Sta. 43+20.10 shall be connected by a vertical curve of 150 feet in
length.
44+79.12, VPC-El. 972.70
45+80.00, VPI-El. 978.60
46+80.88, VPT-El. 979.60
Except that the grade planes
meeting at Sta. 45+80.00 shall be connected by a vertical curve of 202 feet in
length.
Station Elevation
47+50, El. 980.30
48+04.01, VPC-El. 980.84
48+17.00, VPI-El. 980.97
48+29.99, VPT-El. 980.84
48+30.00, end const. Phase IV
(North 1114036.6210, East 2741001.1463)
Phase IV-NW 72nd
Street
Begin
const. 10+00.00=45+49.25, El. 976.21 (intersection with the centerline of N.
Congress Avenue), North 1113755.89, East 2740998.69
Station
Elevation
9+86.00,
El. 975.93
9+73.99,
El. 976.49
9+50, El.
978.94
Section 4. That
this ordinance shall become effective as provided in Section 88.917, RSMo.
_____________________________________________
Approved as to
form and legality:
_____________________________
Brian T.
Rabineau
Assistant City
Attorney