Legislation #: 171009 Introduction Date: 12/14/2017
Type: Ordinance Effective Date: 12/22/2017
Sponsor: None
Title: Authorizing a $6,836,170.00 construction contract with Kissick Construction Company, Inc., for the Blue River South Areas 4 and 5 Inflow and Infiltration (I/I) Reduction Project – Phase 1; authorizing a maximum expenditure of $7,660,000.00; authorizing a $850,000.00 Design Professional Services Amendment No. 3 to Contract No. 1116 with George Butler Associates, Inc., for the Blue River South Area 4 Inflow and Infiltration (I/I) Reduction Project; authorizing a $70,000.00 Design Professional Services Amendment No. 3 to Contract No. 1117 with HNTB Corporation for the Blue River South Area 5 Inflow and Infiltration (I/I) Reduction Project; and recognizing this ordinance as having an accelerated effective date.

Legislation History
DateMinutesDescription
12/14/2017 Filed by the Clerk's office
12/14/2017 Referred to Transportation & Infrastructure Committee
12/21/2017 Advance and Do Pass, Debate
12/21/2017 Passed

View Attachments
FileTypeSizeDescription
171009-Attachments 1.28.2020.pdf Other 161K Attachments
Contracts 0K Contract 1382 on file in the Office of the City Clerk
Project Manual 0K Project Manual on file in the Office of the City Clerk
171009.pdf Authenticated 110K Authenticated
Docket Memo _171009 - 1382 81000687, 81000688 .pdf Other 13K Docket Memo Kissick
1117 Original Docket Memo.pdf Other 29K 2 Docket Memo
Original Docket Memo.pdf Other 32K Docket Memo 1
1382 and 1116 and 1117 Amendments 3 Fact Sheet - Revised 121917.pdf Fact Sheet 59K 171009 Revised Fact Sheet
1117 DPS Amendments 1-3 and Original Contract.pdf Contracts 7039K 1117 DPS Amendments and Original Contract
1116 DPS Amendments 1-3 and Original Contract.pdf Contracts 6685K 1116 DPS Amendments and Original Contract
1382 Construction Contract.pdf Contracts 47587K * 1382 Construction Contract
171009 Ordinance.pdf Other 71K Ordinance
171009 Fiscal Note.pdf Fiscal Note 121K Fiscal Note
171009 Fact Sheet.pdf Fact Sheet 182K Fact Sheet
* - Attachment is too large for LiveWeb to display.

Printer Friendly Version

ORDINANCE NO. 171009

 

Authorizing a $6,836,170.00 construction contract with Kissick Construction Company, Inc., for the Blue River South Areas 4 and 5 Inflow and Infiltration (I/I) Reduction Project – Phase 1; authorizing a maximum expenditure of $7,660,000.00; authorizing a $850,000.00 Design Professional Services Amendment No. 3 to Contract No. 1116 with George Butler Associates, Inc., for the Blue River South Area 4 Inflow and Infiltration (I/I) Reduction Project; authorizing a $70,000.00 Design Professional Services Amendment No. 3 to Contract No. 1117 with HNTB Corporation for the Blue River South Area 5 Inflow and Infiltration (I/I) Reduction Project; and recognizing this ordinance as having an accelerated effective date.

 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

Section 1. That the City Manager is authorized to execute Contract No. 1382, in the amount of $6,836,170.00, with Kissick Construction Company, Inc., for the Blue River South Areas 4 and 5 Inflow and Infiltration (I/I) Reduction Project – Phase 1, Project Nos. 81000687 and 81000688. A copy of this contract is on file in the office of Water Services.

 

Section 2. That the Director of Water Services is authorized a maximum expenditure of $7,660,000.00, from the following accounts to satisfy the cost of this contract:

 

AL-8188-807769-B-611060-81000687 Overflow Control

Program $5,660,000.00

AL-8188-807769-B-611060-81000688 Overflow Control

Program 2,000,000.00

TOTAL $7,660,000.00

 

Section 3. That the City Manager is authorized to execute Design Professional Services Amendment No. 3 to Contract No. 1116, in the amount of $850,000.00, for a total contract amount of $2,050,000.00, with George Butler Associates, Inc., for the Blue River South Area 4 Inflow and Infiltration (I/I) Reduction Project, Project No. 81000687. A copy of this contract is on file in the office of Water Services.

 

Section 4. That the Director of Water Services is authorized to expend up to $850,000.00, from Account No. AL-8187-807769-B-611040-81000687, Overflow Control Program, to satisfy the cost of this amendment.

 

Section 5. That the City Manager is authorized to execute Design Professional Services Amendment No. 3 to Contract No. 1117, in the amount of $70,000.00, for a total contract amount of $545,000.00, with HNTB Corporation for the Blue River South Area 5 Inflow and Infiltration (I/I) Reduction Project, Project No. 81000688. A copy of this contract is on file in the office of Water Services.

 

Section 6. That the Director of Water Services is authorized to expend up to $70,000.00, from Account No. AL-8187-807769-B-611040-81000688, Overflow Control Program, to satisfy the cost of this amendment.

 

Section 7. That this ordinance, relating to the design, repair, maintenance or construction of a public improvement, is recognized as an ordinance with an accelerated effective date as provided by Section 503(a)(3)(D) of the City Charter and shall take effect in accordance with Section 503, City Charter.

 

_____________________________________________

 

I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.

 

 

________________________________

Randall J. Landes

Director of Finance

 

Approved as to form and legality:

 

 

________________________________

Mark P. Jones

Assistant City Attorney