Legislation #: 180341 Introduction Date: 5/3/2018
Type: Ordinance Effective Date: none
Sponsor: None
Title: Authorizing a $2,986,555.00 construction contract with Pyramid Excavation and Construction, Inc., for the Diversion Structures 065 and 073 Consolidation project; authorizing a maximum expenditure of $3,300,000.00; authorizing a $220,000.00 Design Professional Services Amendment No. 1 to Contract No. 1356 with Taliaferro _ Browne, Inc., for the Diversion Structures 065 and 073 Consolidation project; and recognizing this ordinance as having an accelerated effective date.

Legislation History
DateMinutesDescription
5/2/2018 Filed by the Clerk's office
5/3/2018 Referred to Transportation & Infrastructure Committee
5/10/2018 Advance and Do Pass, Debate
5/10/2018 Passed

View Attachments
FileTypeSizeDescription
Project Manual 0K Project Manual on file in the Office of the City Clerk
180341.pdf Authenticated 88K Authenticated
Docket Memo Ordinance #180341.pdf Docket Memo 41K 180341 Docket Memo
1453 1356 Fact Sheet Revised.xls Fact Sheet 81K 1453 1356 Revised Fact Sheet
1356 DPS Contract Amendment 1.pdf Contracts 1970K 1356 DPS Contract and Amendment 1
1453 Construction Contract.pdf Contracts 14119K 1453 Construction Contract
1453 1356 Fact Sheet.xls Fact Sheet 71K 1453 1356 Fact Sheet
1453 1356 Fiscal Note.xls Fiscal Note 45K 1453 1356 Fiscal Note

Printer Friendly Version

ORDINANCE NO. 180341

 

Authorizing a $2,986,555.00 construction contract with Pyramid Excavation and Construction, Inc., for the Diversion Structures 065 and 073 Consolidation project; authorizing a maximum expenditure of $3,300,000.00; authorizing a $220,000.00 Design Professional Services Amendment No. 1 to Contract No. 1356 with Taliaferro & Browne, Inc., for the Diversion Structures 065 and 073 Consolidation project; and recognizing this ordinance as having an accelerated effective date.

 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

Section 1. That the City Manager is authorized to execute Contract No. 1453 in the amount of $2,986,555.00 with Pyramid Excavation and Construction, Inc., for the Diversion Structures 065 and 073 Consolidation project, Project No. 81000680.  A copy of this contract is on file in the office of Water Services.

 

Section 2. That the Director of Water Services is authorized a maximum expenditure of $3,300,000.00 from Account No. AL-8188-807769-B-611060-81000680, Overflow Control Program, to satisfy the cost of the contract.

 

Section 3. That the City Manager is authorized to execute Design Professional Services Amendment No. 1 to Contract No. 1356 in the amount of $220,000.00, for a total contract amount of $383,000.00, with Taliaferro & Browne, Inc. for the Diversion Structures 065 and 073 Consolidation project, Project No. 81000680.  A copy of this contract is on file in the office of Water Services.

 

Section 4. That the Director of Water Services is authorized to expend up to $220,000.00 from Account No. AL-8188-807769-B-611040-81000680, Overflow Control Program, to satisfy the cost of the amendment.

 

Section 5. That this ordinance, relating to the design, repair, maintenance or construction of a public improvement, is recognized as an ordinance with an accelerated effective date as provided by Section 503(a)(3)(D) of the City Charter and shall take effect in accordance with Section 503, City Charter.

 

_____________________________________________

 


I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.

 

 

________________________________

Randall J. Landes

Director of Finance

 

Approved as to form and legality:

 

 

________________________________

Mark P. Jones

Assistant City Attorney