ORDINANCE NO. 930088
Providing for construction of a new bridge carrying the
Brookside/ Main Connection Road over Brush Creek; authorizing a contract for
construction of the bridge in the amount of $3,117,891.70 with Florence
Construction Company; authorizing contracts with Kansas City Power and Light
Company and Southwestern Bell Telephone Company providing for construction of
the bridge to accommodate their facilities at their cost; authorizing a Fourth
Supplement to Agreement 850659 with Howard, Needles, Tammen and Bergendoff to
provide for additional engineering services in connection with the design and
construction; estimating additional revenue in various accounts in the amount
of $2,881,245.00 contribution toward the cost of the bridge and appropriating
such sum to the project account.
BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
Section 1. That the Director of Public Works is
hereby authorized to enter into and execute, on behalf of the City, an
agreement between Kansas City Power and Light Company, a Missouri corporation
and the City of Kansas City, a municipal corporation of the State of Missouri,
relating to the Main/Brookside Connection Bridge over Brush Creek. The
agreement shall be essentially in the form which is attached and incorporated
herein by reference.
Section 2. That the Director of Public Works is
hereby authorized to enter into and execute, on behalf of the City, an
agreement between Southwestern Bell Telephone Company, a foreign corporation
and the City of Kansas City, a municipal corporation of the State of Missouri,
relating to the Main/Brookside Connection Bridge over Brush Creek. The
agreement shall be essentially in the form which is attached and incorporated herein
by reference.
Section 3. That the work of constructing a new
three-span bridge carrying Brookside/Main Connection Road over Brush Creek,
involving construction of cast-in-place concrete abutment and piers, precase
and cast-in-place concrete superstructure elements, concrete approach slabs,
approach grading, toe and channel walls, paving and sewer work, in Kansas City,
Missouri, Council District 4, Project No. 5328, Federal Project No.
BRM-3402(406), is hereby provided for and authorized.
Section 4. That the work shall be done in
accordance with the plans, specifications and the contract therefore between
Kansas City, Missouri, through its Director of Public Works and Florence
Construction Company, a foreign corporation, in the amount of $3,117,891.70,
which contract is hereby approved and confirmed. A copy of the said contract
is on file in the office of the Director of Public Works and is incorporated
herein by reference.
Section 5. That the Director of Public Works is hereby
authorized to enter into and execute on behalf of Kansas City a Fourth
Supplement to Agreement 850659 with Howard, Needles, Tammen and Bergendoff, in
an amount not to exceed $199,722.00 to provide additional items in Phase
B-Design and construction engineering services during the construction
contract. The agreement shall be essentially in the form which is attached and
incorporated herein by reference.
Section 6. That the revenue in the following
accounts of the KCMAC Leasehold Revenue Capital Improvement Fund 1991 is hereby
estimated in the following amounts:
388-089-8295 Contribution from KCPL for Main/ $
64,900.00 Brookside Bridge
388-089-8296 Contribution from SW Bell for Main/
72,600.00 Brookside Bridge
388-089-7784 STP Grant Main/Brookside Bridge
2,743,745.00 $2,881,245.00
Section 7. That the sum of $2,881,245.00 is
appropriated from the Unappropriated Fund Balance of the KCMAC Leasehold
Revenue Capital Improvement Fund 1991, to the following account in the KCMAC
Leasehold Revenue Capital Improvement Fund 1991:
388-089-7459T Main/Brookside Connection
$2,881,245.00
Section 8. That the Director of Public Works is
hereby authorized to expend the sum of $2,881,245.00 from funds heretofore
appropriated plus the sum of $918,527.00 from funds heretofore appropriated to
Account No. 388-089-7459T as and for consideration in the aforesaid contracts
and for contingencies and engineering associated therewith.
_____________________________________________
I hereby certify that there is a balance, otherwise
unencumbered, to the credit of the appropriation to which the foregoing
expenditure is to be charged, and a cash balance, otherwise unencumbered, in
the treasury, to the credit of the fund from which payment is to be made, each
sufficient to meet the obligation hereby incurred.
___________________________________
Director of Finance
Approved as to form and
legality:
___________________________________
Assistant City Attorney