KC Skyline

City Clerk Web Search

Search the Ordinances:

Legislation #: 180335 Introduction Date: 5/3/2018
Type: Ordinance Effective Date: none
Sponsor: None
Title: Authorizing a contract for approximately $3,700,000.00 with Superior Bowen Asphalt Company for the resurfacing of various streets generally between the Missouri River and north city limits; authorizing the Director of Public Works to enter contract changes up to and including twenty percent (20%) of the original contract price; and recognizing this ordinance as having an accelerated effective date.

Legislation History
DateMinutesDescription
5/2/2018 Filed by the Clerk's office
5/3/2018 Referred to Transportation & Infrastructure Committee
5/24/2018 Advance and Do Pass, Debate
5/24/2018 Passed

View Attachments
FileTypeSizeDescription
Project Manual 0K Project Manual on file in the Office of the City Clerk
180335.pdf Authenticated 67K Authenticated
Docket Memo 180335 #18-1.pdf Docket Memo 80K Docket Memo 18-1 Superior Bowen
Fiscal Note 18-1 Superior Bowen Asphalt Resurfacing Contract.pdf Fiscal Note 73K PW Fiscal Note
Fact Sheet 18-1 Superior Bowen Asphalt Resurfacing Contract.pdf Fact Sheet 103K PW Fact Sheet

Printer Friendly Version

ORDINANCE NO. 180335

 

Authorizing a contract for approximately $3,700,000.00 with Superior Bowen Asphalt Company for the resurfacing of various streets generally between the Missouri River and north city limits; authorizing the Director of Public Works to enter contract changes up to and including twenty percent (20%) of the original contract price; and recognizing this ordinance as having an accelerated effective date.

 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

Section 1. That the Director of Public Works is hereby authorized to execute a contract with Superior Bowen Asphalt Company in the amount of $3,670,947.60 for the resurfacing of various streets in the 2018-2019 season as shown in Contract 18-1 and the performance of other incidental and related work in Kansas City, Missouri, generally between the Missouri River and north city limits, from funds previously appropriated to Account No. 19-2080-897701-B-89008533, Street Resurfacing. A copy of the contract is on file in the office of the Director of Public Works.

Section 2. That the Director of Public Works is authorized to enter into contract changes up to and including twenty percent (20%) of the original contract price for related work.

Section 3. That this ordinance, relating to the design, repair, maintenance or construction of a public improvement, is recognized as an ordinance with an accelerated effective date as provided by Section 503(a)(3)(D) of the City Charter and shall take effect in accordance with Section 503, City Charter.

_____________________________________________

  I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.

 

 

______________________________

Randall J. Landes

Director of Finance

 

Approved as to form and legality:

 

 

______________________________

Dustin Johnson

Assistant City Attorney