Legislation #: 140675 Introduction Date: 8/21/2014
Type: Ordinance Effective Date: none
Sponsor: None
Title: Authorizing a $3,369,000.00 construction contract with Havens Construction, Inc. for the Middle Blue River Neighborhood Sewer Rehabilitation Area 1 Project; and authorizing an $850,000.00 design professional services contract with CH2M Hill Engineers, Inc. for construction phase services for the Middle Blue River Neighborhood Sewer Rehabilitation Areas 1 and 2 Project.

Legislation History
DateMinutesDescription
8/20/2014 Filed by the Clerk's office
8/21/2014 Referred to Transportation & Infrastructure Committee
8/28/2014 Advance and Do Pass, Debate
8/28/2014 Passed

View Attachments
FileTypeSizeDescription
Contracts 0K Middle Blue River Neighborhood Sewer Rehibilitation-Project Area 1 filed in the office of the City Clerk
140675.pdf Authenticated 127K Authenticated
140675.pdf Docket Memo 9K Docket Memo
140675 b.pdf Docket Memo 8K Docket Memo
140675 Fiscal Note.pdf Fiscal Note 17K Fiscal Note
140675 Fact Sheet.pdf Fact Sheet 110K Fact Sheet

Printer Friendly Version

ORDINANCE NO. 140675

 

Authorizing a $3,369,000.00 construction contract with Havens Construction, Inc. for the Middle Blue River Neighborhood Sewer Rehabilitation Area 1 Project; and authorizing an $850,000.00 design professional services contract with CH2M Hill Engineers, Inc. for construction phase services for the Middle Blue River Neighborhood Sewer Rehabilitation Areas 1 and 2 Project.

 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

Section 1. That the Director of Water Services Department is hereby authorized to execute, on behalf of Kansas City, Contract No. 1128, Project No. 81000720, with Havens Construction, Inc., in the amount of $3,369,000.00, for rehabilitation of existing 12-inch and smaller sewer mains, and associated manholes and service laterals within the public right-of-way for the Middle Blue River Neighborhood Sewer Rehabilitation Area 1 Project, located in Jackson County, Kansas City, Missouri.  A copy of this contract is on file in the office of the Director of Water Services.

 

Section 2. That the Director of Water Services Department is hereby authorized to execute, on behalf of Kansas City, Contract No. 1136, Project No. 81000720, with CH2M Hill Engineers, Inc., in the amount of $850,000.00, for construction office and field support services and resident project representative services for the Middle Blue River Neighborhood Sewer Rehabilitation Areas 1 and 2 Project.  A copy of this contract is on file in the office of the Director of Water Services.

 

Section 3. That the Director of Water Services is authorized to expend up to the sum of $3,700,000.00, from Account No. AL-8186-807769-B-611060-81000720, Overflow Control Plan, to satisfy the construction costs of this project.

 

Section 4. That the Director of Water Services is authorized to expend up to the sum of $850,000.00, from Account No. AL-8186-807769-B-611040-81000720, Overflow Control Plan, to satisfy the design professional services costs of this project.

 

_____________________________________________

 


I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.

 

 

________________________________

Randall J. Landes

Director of Finance

 

Approved as to form and legality:

 

 

________________________________

Mark P. Jones

Assistant City Attorney