Legislation #: 931282 Introduction Date: 11/4/1993
Type: Ordinance Effective Date: 11/28/1993
Sponsor: None
Title: Authorizing a change order to the City's contract with Tomahawk Construction for additional work to be included in the Trans- Missouri River Tunnel Contract 3, Upshaft Transmission Main; and appropriating $85,000.00 in funding therefore.

Legislation History
DateMinutesDescription
11/3/1993

Prepare to Introduce

11/4/1993

Referred Operations And Aviation

11/17/1993

Advance and Do Pass

11/18/1993

Passed


View Attachments
FileTypeSizeDescription
No attachment(s) found

Printer Friendly Version

 

ORDINANCE NO. 931282

 

Authorizing a change order to the City's contract with Tomahawk Construction for additional work to be included in the Trans- Missouri River Tunnel Contract 3, Upshaft Transmission Main; and appropriating $85,000.00 in funding therefore.

 

WHEREAS, Ordinance No. 920798 was passed by the City Council on July 30, 1992, approving Contract No. 6326 with Tomahawk Construction for the Trans-Missouri River Tunnel Contract 3, Upshaft Transmission Main; and

 

WHEREAS, additional funds are required to pay the contractor for additional work required due to the flooding of 1993 at the Water Treatment Plant Facility, and

 

WHEREAS, a portion of this additional work is eligible for FEMA reimbursement in accordance with the program requirements; NOW THEREFORE,

 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

Section 1. That the Director of Water and Pollution Control is hereby authorized to execute, on behalf of the City, an $85,000.00 Change Order to Contract 6326 with Tomahawk Construction for additional work required for the Trans-Missouri River Tunnel Upshaft Transmission Main. A copy of this Change Order is on file in the office of the Director of Water and Pollution Control.

 

Section 2. That the sum of $85,000.00 is hereby appropriated from the Unappropriated Fund Balance of the Water Construction Fund to the following account:

 

806-080-7277-T Tunnel CTR Upshaft T/M Main $85,000.00

 

Section 3. That the Director of Water and Pollution Control is hereby authorized to expend up to the sum of $85,000.00 to satisfy the cost of this additional work to be included in Contract No. 6326 by Change Order.

 

Section 4. That upon completion of the final costs of this project, the Director of Finance is hereby directed to return the unexpended portion of this appropriation to the Unappropriated Fund Balance from which it was derived.

 

_____________________________________________

 

I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.

 

 

__________________________________

Director of Finance

 

 

Approved as to form and legality:

 

 

__________________________________

Assistant City Attorney