Legislation #: 190171 Introduction Date: 2/21/2019
Type: Ordinance Effective Date: none
Sponsor: None
Title: Authorizing a $974,000.00 construction contract with Radmacher Brothers Excavating Company, Inc., for the Facility Improvements at North Airport and Truman Bridge Flood Pump Stations; authorizing a maximum expenditure of $1,022,700.00; and recognizing this ordinance as having an accelerated effective date.

Legislation History
DateMinutesDescription
2/21/2019 Filed by the Clerk's office
2/21/2019 Referred to Transportation & Infrastructure Committee
2/28/2019 Advance and Do Pass, Debate
2/28/2019 Passed

View Attachments
FileTypeSizeDescription
Project Manual 0K Project Manual on file in the Office of the City Clerk
190171.pdf Authenticated 60K Ordainance
Docket Memo-390-Facility Improvements at North Airport.02.26.19.doc Docket Memo 29K 390 2nd Revised Docket Memo
Docket Memo-390-Facility Improvements at North Airport.02.26.19.doc Docket Memo 29K 390 Revised Docket Memo
TI 2-28-19 - KCW.pdf Other 254K PowerPoint presentation
390 - 82000246 Facility Improv. @ N AIrport Truman Flood Pump Station - Docket Memo.pdf Docket Memo 33K 390 Docket Memo
390 Construction Contract.pdf Contracts 14518K 390 Construction Contract
390 Fiscal Note.xls Fiscal Note 54K 390 Fiscal Note
390 Fact Sheet.xls Fact Sheet 76K 390 Fact Sheet

Printer Friendly Version

ORDINANCE NO. 190171

 

Authorizing a $974,000.00 construction contract with Radmacher Brothers Excavating Company, Inc., for the Facility Improvements at North Airport and Truman Bridge Flood Pump Stations; authorizing a maximum expenditure of $1,022,700.00; and recognizing this ordinance as having an accelerated effective date.

 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

Section 1. That the Director of the Water Services Department is authorized to execute Contract No. 390 in the amount of $974,000.00 with Radmacher Brothers Excavation Company, Inc. for the Facility Improvements at North Airport and Truman Bridge Flood Pump Stations; Project No. 82000246. A copy of the contract is on file in the office of Water Services.

Section 2. That the Director of the Water Services Department is authorized a maximum expenditure of $1,022,700.00 from Account No. 19-8200-807760-B-82000246, to satisfy the cost of this contract.

Section 3. That this ordinance, relating to the design, repair, maintenance or construction of a public improvement, is recognized as an ordinance with an accelerated effective date as provided by Section 503(a)(3)(D) of the City Charter and shall take effect in accordance with Section 503, City Charter.

 

______________________________________________

 

I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.

 

 

 

Randall J. Landes

Director of Finance

 

Approved as to form and legality:

 

 

 

Mark P. Jones

Assistant City Attorney