Legislation #: 051417 Introduction Date: 11/17/2005
Type: Ordinance Effective Date: none
Sponsor: COUNCILMEMBER HERMANN
Title: Approving a final plan in District M-P on approximately a 12.96 acre tract of land within an existing M-P district plan of 33.4 acres, generally located on the west side of N.E. Chouteau Trafficway at N.E. 33rd Terrace. (13000-P-3)

Legislation History
DateMinutesDescription
11/17/2005 Filed by the Clerk's office
11/17/2005 Referred to Planning, Zoning & Economic Development Committee
12/14/2005 Advance and Do Pass, Debate
12/15/2005 Passed

View Attachments
FileTypeSizeDescription
051417.pdf Authenticated 132K Authenticated
051417 staff report.doc Staff Report 58K Staff Report
051417 fact sheet.doc Fact Sheet 75K Revised Fact Sheet
fact sheet.doc Advertise Notice 75K fact sheet

Printer Friendly Version

ORDINANCE NO. 051417

 

Approving a final plan in District M-P on approximately a 12.96 acre tract of land within an existing M-P district plan of 33.4 acres, generally located on the west side of N.E. Chouteau Trafficway at N.E. 33rd Terrace. (13000-P-3)

 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

Section A. That a final plan in District M-P (Planned Industrial District) on approximately a 12.96 acre tract of land generally located on the west side of N.E. Chouteau Trafficway, on either side of N.E. 33rd Terrace, and more specifically described as follows:

 

Final Plan area: All of Lot 1 and Lot 2, Cerner Campus, Third Plat, A Subdivision of land in the City of Kansas City, Clay County, Missouri

 

Within the Total M-P District plan legally described as follows:

 

Tract 1: All of Lots 1, 2, 3, 4, 5, 6, 7 and 8, Chouteau Industrial Park Resurvey, a subdivision in Kansas City, Clay County, Missouri, according to the recorded plat thereof.

 

Tract 2: A part of the West One Half of the Southeast One Quarter of Section 7, Township 50 North, Range 32 West of the Fifth Principal Meridian, in Kansas City, Clay County, Missouri, described as follows: Beginning at the southeast corner of Lot 4, Chouteau Industrial Park, according to the duly recorded plat filed of record May 26, 1961, in Plat Book 11 at page 16, which point is the west line of Missouri State Highway No. 269 and is 312.53 feet north of the south line of said Quarter Section; thence South 89 degrees 46 minutes 10 seconds West and parallel to the south line of said Quarter Section a distance of 238.88 feet to a point 626.16 feet west of the east line of the West One-Half of said Quarter Section; thence South 0 degrees 19 minutes 40 seconds West and parallel to the east line of the West One-Half of said Quarter Section a distance of 103.70 feet to a point in the north line of a tract condemned for park purposes in Suit No. 23420 in Circuit Court of Clay County, Missouri; thence North 89 degrees 46 minutes 10 seconds East along said park tract to a point in the west line of Missouri State Highway No. 269; thence northerly in the west line of said Highway No. 269 to the point of beginning.

 

is hereby approved, subject to the following conditions:

 

1. That the developer update the previously approved macro storm drainage study for the overall development to address the development amendments along with a detailed micro study for approval prior to issuance of building permits and make necessary improvements as required by Development Services.

 

2. That the developer obtain the grading consents, and all grading, temporary construction and drainage easements from the abutting property owner prior to submitting any public improvements.

 

3. That the developer obtain a permit from the Missouri Department of Transportation prior to working within any State highway right-of-way,

 

4. That the developer submit plans for grading, siltation, and erosion control to Development Services for approval and permitting prior to beginning any construction activities.

 

5. That the developer secure a site disturbance permit from Development Services prior to beginning any construction, grading, clearing, or grubbing activities, if the disturbed area exceeds one acre.

 

6. That the developer extend sanitary sewers to ensure individual service is provided to all proposed lots and determine adequacy as required by Development Services.

 

7. That the developer provide a storm water conveyance system to serve all proposed lots within the development and determine adequacy as required by Development Services.

 

8. That the developer submit covenants, conditions and restrictions to the Law Department for approval for the maintenance of private open space and enter into a covenant agreement for the maintenance of any stormwater detention area tracts.

 

9. That the developer provide easements and extend water mains as required by the Water Services Department.

 

10. That the developer provide fire protection as required by the Fire Department.

 

11. That the developer receive approval from the Board of Zoning Adjustment for a setback variance and any other necessary variances prior to receiving a building permit for Phase Two (2).

 

12. That the developer abide by further corrections and/or recommendations of the City Engineering Division of Public Works.

 

A copy of said final plan is on file in the office of the City Clerk with this ordinance and is made a part hereof.

 

Section B. That the Council finds and declares that before taking any action on the proposed final plan hereinabove, all public notices and hearings required by the Zoning Ordinance have been given and had.

 

_____________________________________________

 

I hereby certify that as required by Chapter 80, Code of Ordinances, the foregoing ordinance was duly advertised and public hearings were held.

 

 

___________________________________

Secretary, City Plan Commission

 

Approved as to form and legality:

 

___________________________________

M. Margaret Sheahan Moran

Assistant City Attorney