Legislation #: 160546 Introduction Date: 7/21/2016
Type: Ordinance Effective Date: 8/12/2016
Sponsor: None
Title: Authorizing a $15,418,916.00 Construction Contract with Kissick Construction Company, Inc., for the Middle Blue River Basin Sewer Pipe Consolidation Phase I - Outfall 063, Sewer Separation - Diversion 099 and Water Main Replacement in the Area of Garfield Avenue to Spruce Avenue, E. 67th Street to E. 73rd Street Projects; authorizing a maximum expenditure of $17,000,000.00; authorizing a $1,540,000.00 Design Professional Services Contract Amendment No. 3 to Contract No. 1112 with Shafer, Kline _ Warren, Inc., for the Middle Blue River Basin: Sewer Pipe Consolidation Outfall 063 Project; and recognizing this ordinance as having an accelerated effective date.

Legislation History
DateMinutesDescription
7/20/2016 Filed by the Clerk's office
7/21/2016 Referred to Transportation & Infrastructure Committee
8/11/2016 Advance and Do Pass, Debate
8/11/2016 Passed

View Attachments
FileTypeSizeDescription
81000699.pdf Advertise Notice 44660K * Blue Middle Basin Sewer Pipe - 81000699
Project Manual 0K Project Manual filed in the Office of the City Clerk 092616
160546.pdf Authenticated 93K Authenticated
160546 M-WBE Memo.pdf Docket Memo 46K 160546 M-WBE Memo
160546 Fact Sheet Revised 072516.pdf Fact Sheet 63K 160546 Fact Sheet REVISED 072516
1112 Middle Blue River Outfall 063 Amendments 1-3 and Original Contract.pdf Contracts 1268K 1112 Design Professional Amendments and Original Contract
1263 Middle Blue River...Outfall 063...WMR Contract Documents.pdf Contracts 57805K * 1263 Construction Contract Documents
160546 Fiscal Note.pdf Fiscal Note 16K Fiscal Note
* - Attachment is too large for LiveWeb to display.

Printer Friendly Version

ORDINANCE NO. 160546

 

Authorizing a $15,418,916.00 Construction Contract with Kissick Construction Company, Inc., for the Middle Blue River Basin Sewer Pipe Consolidation Phase I - Outfall 063, Sewer Separation - Diversion 099 and Water Main Replacement in the Area of Garfield Avenue to Spruce Avenue, E. 67th Street to E. 73rd Street Projects; authorizing a maximum expenditure of $17,000,000.00; authorizing a $1,540,000.00 Design Professional Services Contract Amendment No. 3 to Contract No. 1112 with Shafer, Kline & Warren, Inc., for the Middle Blue River Basin: Sewer Pipe Consolidation Outfall 063 Project; and recognizing this ordinance as having an accelerated effective date.

 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

Section 1. That the Director of Water Services Department is authorized to execute Contract No. 1263 in the amount of $15,418,916.00 with Kissick Construction Company, Inc., for the Middle Blue River Basin Sewer Pipe Consolidation Phase I - Outfall 063, Sewer Separation - Diversion 099 and Water Main Replacement in the Area of Garfield Avenue to Spruce Avenue, E. 67th Street to E. 73rd Street Projects, Project Nos. 81000699, 81000703, and 80001932.  A copy of this contract is on file in the office of Water Services.

 

Section 2. That the Director of Water Services is authorized to expend up to the maximum of $4,200,000.00 from Account No. AL-8075-807705-B-611060-80001932, Water Main Replacement Program, and $12,800,000.00 from Account No. AL-8187-807769-611060-81000699, Overflow Control Program, to satisfy the cost of this contract.

 

Section 3. That the Director of Water Services Department is authorized to execute Design Professional Services Amendment No. 3 to Contract No. 1112 in the amount of $1,540,000.00 with Shafer, Kline & Warren, Inc., for the Middle Blue River Basin: Sewer Pipe Consolidation Outfall 063 Project, Project No. 81000699.  A copy of this amendment is on file in the office of Water Services.

 

Section 4. That the Director of Water Services is authorized to expend up to the sum of $1,540,000.00 from Account No. AL-8187-807769-B-611040-81000699, Overflow Control Program, to satisfy the cost of this amendment.

 

Section 5. That this ordinance, relating to the design, repair, maintenance or construction of a public improvement, is recognized as an ordinance with an accelerated effective date as provided by Section 503(a)(3)(D) of the City Charter and shall take effect in accordance with Section 503, City Charter.

 

_____________________________________________

 

I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.

 

 

________________________________

Randall J. Landes

Director of Finance

 

Approved as to form and legality:

 

 

________________________________

Mark P. Jones

Assistant City Attorney