Legislation #: 080315 Introduction Date: 3/27/2008
Type: Ordinance Effective Date: none
Sponsor: COUNCILMEMBER MARCASON
Title: Authorizing a $260,150.00 Amendment No. 2 to a contract with HNTB Corporation for Contract No. 106, design of the Troost at Brush Creek Channel Improvements project from previously appropriated funds; and recognizing an emergency.

Legislation History
DateMinutesDescription
3/27/2008 Filed by the Clerk's office
3/27/2008 Referred to Transportation and Infrastructure Committee
4/2/2008 Advance and Do Pass, Debate
4/3/2008 Passed

View Attachments
FileTypeSizeDescription
080315.pdf Authenticated 63K Authenticated
080315.doc Docket Memo 30K Docket Memo
Troost at Brush Creek Amendment 2 Fact Sheet.xls Fact Sheet 109K Contract No 106 Amendment 2 Fact Sheet
Troost at Brush Creek Amendment 2 Fiscal Note.xls Fiscal Note 37K Contract No 106 Amendment 2 Fiscal Note

Printer Friendly Version

ORDINANCE NO. 080315

Authorizing a $260,150.00 Amendment No. 2 to a contract with HNTB Corporation for Contract No. 106, design of the Troost at Brush Creek Channel Improvements project from previously appropriated funds; and recognizing an emergency.

WHEREAS, the City and HNTB executed Contract No. 106 and a first amendment totaling $1,829,694.00 following approval of Ordinance No. 070182 in February, 2007 for bridge, channel, roadway and associated improvements for the Troost at Brush Creek project; and

WHEREAS, a second amendment is needed to complete the final design and prepare bid documents for a new water transmission line along Emanuel Cleaver II Boulevard, to integrate the public art component into the bridge, to incorporate a fountain into the Brush Creek Channel east of the new bridge, and to extend the Troost Avenue streetscape improvements; NOW, THEREFORE, 

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY: 

Section 1. That the Director of Water Services Department is hereby authorized to execute, on behalf of Kansas City, a $260,150.00 Amendment No. 2 to Contract No. 106 with HNTB Corporation for additional design work associated with the Troost at Brush Creek Channel Improvements project, from funds previously appropriated to Account No. 08-3090-807521-B. A copy of the contract amendment is on file in the office of the Director of Water Services.

Section 2. That this ordinance, relating to the design, repair, maintenance or construction of a public improvement, is recognized as an emergency measure within the provisions of Section 503 of the City Charter and shall take effect in accordance with that section.

_____________________________________________

 

I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.

 

___________________________________

Wanda Gunter

Acting Director of Finance

 

Approved as to form and legality:

 

___________________________________

Cecilia OConnor Abbott

Assistant City Attorney